Cast to specification, delivered ready to set.
Drainage, paving, boundary, chambers, blocks and traffic products, cast from our own aggregate and concrete, cured properly, and delivered to the sequence your programme needs.
Drainage, paving, boundary, chambers, blocks and traffic products, cast from our own aggregate and concrete, cured properly, and delivered to the sequence your programme needs.
Standard items are cast to IS dimensions and held in stock through the season. Non-standard sizes and reinforcement are made to drawing.
RCC pipes to IS 458, supplied with collars and rubber rings. Class is chosen by the depth of cover and the traffic loading over the line . Tell us the trench detail and we will advise.
The commonest paving failure on site is an 60mm block laid where a loaded truck turns. Pick by traffic, not by budget, and get the bedding sand and edge restraint right underneath.
AAC is lighter and insulates better, fly ash is denser and cheaper per unit. On a tall frame the dead load saved by AAC pays for itself in steel and foundation. On a boundary or a service block, fly ash usually wins.
Most failures in precast are traceable to under-cured concrete or a reinforcement cage in the wrong place. Both are process problems, so we control the process rather than inspect the outcome.
It depends on the depth of cover and the traffic over the line. NP2 for light duty away from roads, NP3 for most municipal and road-crossing work, NP4 for heavy loading and deep cover. Send the trench section and we'll confirm.
60mm for footpaths and light pedestrian areas, 80mm for driveways and car parking, 100mm and above for yards taking loaded trucks. Bedding sand and edge restraint matter as much as thickness.
Yes. Chambers, covers, boundary panels and special sections are cast against your drawing, with the reinforcement detail you specify. Mould cost and lead time depend on the quantity.
Standard items in stock go out within a day or two. Made-to-order items depend on mould availability and curing . Typically two to three weeks, and we'll tell you before you commit.
For drainage lines and precast boundary systems, yes. We can quote supply-only or supply-and-lay, and we'll price the unloading arrangement either way.
Yes, thin-bed mortar is supplied along with the blocks. Using ordinary sand-cement mortar on AAC wastes the block's advantages, so they go together.
Drawings are welcome for non-standard items. We quote ex-works and delivered, and we'll tell you the lead time honestly.